Section 8 inspection checklist: how to prepare for an NSPIRE inspection
This Section 8 inspection checklist follows what inspectors check under NSPIRE, HUD’s newer inspection standards. HUD’s checklist for Housing Choice Voucher units, dated May 8, 2026, covers 63 standards and rates each deficiency by severity, which sets whether your unit fails and how long you have to fix it. Once your housing authority (PHA), the local agency running the voucher program, inspects under NSPIRE, it uses that checklist or another tool applying the same standards.
For depth, see every life-threatening deficiency, what changed from HQS and the February 1, 2027 deadline.
What does a Section 8 inspection cover?
Your housing authority, not HUD, inspects. HUD’s checklist has three areas: Unit, your assisted unit; Inside, the building’s common areas; and Outside. Only common and outside areas serving your unit count, such as the way out to the street, a shared laundry and the systems serving it. Notice PIH 2026-18, issued July 15, 2026, says NSPIRE drops subjective opinions on housekeeping and cosmetics, so an untidy unit does not fail on its own.
Every deficiency is rated life-threatening, severe, moderate or low, and the unit passes or fails as a whole, with no score. Life-threatening items fail, with 24 hours to fix. Severe and moderate items fail, with 30 days or an extension your housing authority approves. Low items pass and are “noted by the inspector for information purposes.”
NSPIRE measures where the old Housing Quality Standards (HQS) judged: HQS barred “large holes” in walls, while NSPIRE cites a wall hole more than 2 inches across. Your housing authority may use HQS until February 1, 2027, and must tell you when NSPIRE applies to your inspections, but the smoke and carbon monoxide alarm rules and the 24-hour rule for unvented fuel-burning space heaters apply under either standard. NSPIRE vs HQS covers the main changes.
Your Section 8 inspection checklist, room by room
Walk the life-threatening items first, such as a missing or silent smoke or carbon monoxide alarm, a blocked exit or exposed wiring; the life-threatening list gives every one in HUD’s words. In an occupied unit, arrange a time with your tenant and give any notice your lease and state law require. Bring a tape measure, a three-prong outlet tester with a GFCI button, a thermometer and spare bulbs.
Every room, including bedrooms and living areas
- Test every outlet you can reach. A dead outlet with no visible damage is severe, and so is a three-prong outlet that tests miswired, or ungrounded without GFCI protection. A damaged outlet or switch, or a cover plate that is missing or damaged in a way that affects how it works, is life-threatening.
- Outlets within 6 feet of a water source need GFCI protection (exceptions in the table); press each GFCI’s test and reset buttons.
- Every permanent light fixture must work; replace dead bulbs.
- Windows designed to open must open, stay open without a prop and close, and those designed to lock need a lock attached to the window, not a stick or dowel. A window that will not close is severe; one that will not open, stay open or lock is moderate. Windows with a permanent air conditioner skip these checks.
- In any room used for sleeping on the 3rd floor or below, the rescue window must open fully. Locks needing a key, tool, or special knowledge or effort to open from inside, fixed bars, key locks on movable bars, a permanent window air conditioner and items or furniture you supplied may obstruct it. HUD’s Window standard sends a rescue window that will not open or stay open to the Egress standard, not the moderate window item, and a rescue opening that is blocked or does not fully open is life-threatening.
- From October 1 through March 31, take the temperature in each room with an exterior wall. Portable space heaters, fireplaces, wood stoves and cooking appliances are not permanent heat.
- Patch wall and ceiling holes, reattach loose drywall, plaster or paneling, and repair rotted, sloping or sagging floors. Loose wallpaper is not cited, and lifted tiles count only as a trip hazard.
- Any sign of roaches, bedbugs, mice, rats or other pests is moderate. A live roach, bedbug or mouse in two or more rooms during a daytime look, or any live rat, is severe. Starting an appropriate, documented pest management plan counts as the correction.
- Look for mold-like growth and damp signs such as peeling paint or stains; inspectors check damp spots with a moisture meter.
- In housing built before 1978 where a child under 6 lives or will live, and in any pre-1978 Project-Based Voucher unit, deteriorated paint in the unit, its common areas or outside fails; repairs must follow the Lead Safe Housing Rule.
Entry and exits
- Each entry door must close and lock with at least one installed lock; HUD’s Door - Entry standard accepts one that engages from both sides, with a key, keypad, card or code outside. A unit entry door that cannot be secured is severe; a building entry door, moderate.
- Remove double-keyed deadbolts and any lock needing a key, tool, or special knowledge or effort to open from inside, on exit doors and doors on the way out, bedroom doors included. HUD’s Egress standard does not allow such locks and lists them, with fixed bars over an exit door and key locks on movable door bars, as conditions that may obstruct the way out, which is life-threatening.
- Repair holes or cracks right through the door with equivalent materials, and fix a damaged frame, threshold, trim or seal.
Kitchen
- Run hot and cold water and shut both off, then fill the sink and let it drain. The sink must be firm against the wall.
- Turn on every burner and the oven. No working burner or an oven that does not heat is severe; one dead burner is moderate.
- The refrigerator must keep food cold and the freezer frozen, with an intact door seal.
Bathrooms
- Flush each toilet: it should drain and refill, and its base should not move. A toilet that keeps running is low and passes.
- Run the tub or shower, then check that it drains and the knobs and diverter work.
- Each bathroom needs a working exhaust fan, a window that opens from inside, or another working means of ventilation or dehumidification. Any fan present must still respond to its switch, have unrestricted airflow and be undamaged; each failure is moderate.
- Any grab bar must be firm.
Halls, stairs and alarms
- Put smoke alarms where the table lists. Since December 29, 2024, each must be hardwired or a sealed 10-year battery unit, and hardwired in a unit built or substantially rehabilitated after December 29, 2022. Alarms must suit any hearing-impaired occupant.
- Press every test button and remove paint, tape or covers. A missing, covered or silent alarm is life-threatening.
- With a fuel-burning appliance or fireplace, or an attached garage (under NSPIRE, one without ventilation), among other cases, you need a carbon monoxide (CO) alarm inside or right outside each bedroom. A dead battery in any CO alarm is life-threatening.
- Check that every stair tread is present, firm and level, then push and pull each handrail and guardrail.
Utility spaces
- Hot water must reach the kitchen and bathroom taps; no hot water is severe.
- The water heater’s relief valve must not leak or be obstructed, and its discharge pipe must not be damaged, capped, sloping upward or of unsuitable material; each is severe. A missing pipe is moderate.
- A fuel-burning water heater or furnace needs a connected, aligned, unblocked flue or exhaust vent without holes (metal tape is no fix). A gas water heater needs an undamaged shutoff valve, a gas furnace needs its shutoff valve, and a furnace needs a combustion chamber cover. Each is life-threatening.
- Keep anything flammable or combustible more than 3 feet from the furnace, heaters and a fuel-burning water heater, and keep unvented gas, oil or kerosene space heaters out of the unit; both are life-threatening. Ask your tenant to move any that are theirs.
- The electrical panel must be reachable and openable. An open breaker slot (an exposed conductor) or a damaged breaker or fuse is life-threatening.
- Pull out the dryer: a detached, missing or unsuitable transition duct (it must be metal or another approved material), or a blocked vent, is life-threatening.
- Fix active leaks. Water touching wiring is life-threatening, as is any gas, propane or oil leak or uncapped gas or fuel supply line.
- A fire extinguisher you supply must be in place and undamaged, with its gauge reading charged and a current, readable service tag; each failure is life-threatening. One your tenant owns is not checked.
Outside and common areas
- The way from your entry door to the street must be clear; a keyed gate or fence on it can count as an obstructed exit.
- Check outdoor steps, handrails and guardrails, and GFCI protection on every outdoor outlet.
- Check the roof for holes, each exterior wall for missing covering of 1 square foot or more, and the foundation for cracks. Walkways and the driveway must be passable, fences complete and standing, and gates able to open, close and latch.
- Exterior lights must work, the address must be visible, and gutters and downspouts attached and clear.
- In shared halls and a laundry serving your unit, check for a smoke alarm on each level and in each common area, then lights, stairs, dryer vents and any exit signs, and clear litter, which fails there as moderate.
UnitTuneUp runs this walk on your phone.
What do inspectors measure?
These numbers come from HUD’s NSPIRE standards and 24 CFR 5.703. Results are for your unit unless a row says otherwise.
| Check | HUD’s threshold | If it fails |
|---|---|---|
| Smoke alarms | Every level, inside each bedroom, within 21 feet of each bedroom door measured along the path of travel, and on the living-area side of any door between an alarm outside a bedroom and the living area | Missing: life-threatening, 24 hours |
| Smoke alarm mounting | Ceiling: more than 4 inches from the wall. Wall: top edge 4 to 12 inches below the ceiling. Both: at least 10 feet from a cooking appliance | Not a separate deficiency: HUD’s Smoke Alarm standard says a ceiling alarm “must” be more than 4 inches from the wall, a wall alarm “cannot” sit outside the 4 to 12 inch band, and the stove distance “should” be met |
| GFCI protection | Outlets within 6 feet of a sink, tub, shower, faucet or toilet in the same room, measured center to center; outlets dedicated to a major appliance, and outlets below the counter inside an enclosed cabinet, are not checked | Severe, 30 days |
| Heat, October 1 to March 31 | Measured 3 feet above the floor and 2 feet from an exterior wall; not applied in Hawaii or the US territories | Below 64°F or not working: life-threatening, 24 hours. 64 to 67.9°F: severe, 30 days |
| Guardrail | Any walking surface with a drop of 30 inches or more; rail at least 30 inches high and firmly attached | Life-threatening, 24 hours |
| Handrail | Stairs with 4 or more risers; 28 to 42 inches high, full length, no movement | Loose, inadequate or removed: moderate, 30 days. Never installed: passes (not rated in the unit; low in common and outside areas) |
| Flammables | Nothing flammable or combustible on or within 3 feet of a heater or fuel-burning water heater | Life-threatening, 24 hours |
| Water heater relief pipe | Ends 2 to 6 inches from the flood level of the drain or receptor it empties into | Missing or out of range: moderate, 30 days |
| Wall and ceiling holes | Wall: over 2 inches across, or holes in one wall adding up to more than 6 by 6 inches. Ceiling: 2 inches or more, or any hole open to the outside | Moderate, 30 days |
| Trip hazards | A rise of ¾ inch or more, or a gap of 2 inches or more across the walking path | Moderate, 30 days |
| Floors | Substrate exposed on 10% or more of a room’s floor | Moderate, 30 days |
| Mold-like growth | All patches in one room added together; 4 square inches or less is not cited | Over 4 square inches: moderate, 30 days. Over 1 square foot: severe, 30 days. Over 9 square feet: life-threatening, 24 hours |
| Window screens | Not required, but a screen that is there, or was installed before, must be present and intact | Missing after being installed, or a hole, tear or cut of 1 inch or more: moderate, 30 days |
| Exterior paint, wall built after 1978 | 10 square feet or more peeling on one wall | Outside: moderate, 30 days |
What must every Section 8 unit have?
HUD marks some checklist items with an asterisk: affirmative habitability requirements, the features your unit must have, such as smoke alarms, GFCI protection near water and permanent heat (except in Hawaii and the US territories). The asterisk is not a severity; each item’s own rating sets the result.
HUD’s NSPIRE checklist for Housing Choice Voucher units, dated May 8, 2026, marks 18 deficiencies under 14 standards as affirmative habitability requirements: features your unit must have. Each quoted line is HUD’s own wording, with HUD’s severity, the time to fix it, and the areas of the checklist that list it.
Bathtub and Shower
- “Bathtub or shower cannot be used in private.*” Moderate, fix within 30 days · Unit, Inside
Cabinet and Storage
- “Food storage space is not present.*” Moderate, fix within 30 days · Unit
Carbon Monoxide
- “Carbon monoxide alarm is missing, not installed, or not installed in a proper location.*” Life-threatening, fix within 24 hours · Unit
Cooking Appliance
- “Primary cooking appliance is missing.*” Moderate, fix within 30 days · Unit
Electrical - GFCI/AFCI
- “An unprotected outlet is present within six feet of a water source.*” Severe, fix within 30 days · Unit, Inside, Outside
Food Preparation Area
- “Food preparation area is not present.*” Moderate, fix within 30 days · Unit
Guardrail
- “Guardrail is missing or not installed.*” Life-threatening, fix within 24 hours · Unit, Inside, Outside
Heating, Ventilation, and Air Conditioning (HVAC)
- “The inspection date is on or between October 1 and March 31 and the permanently installed heating source is not working or the permanently installed heating source is working and the interior temperature is below 64 degrees Fahrenheit.*” Life-threatening, fix within 24 hours · Unit
- “Unvented space heater that burns gas, oil, or kerosene is present.*” Life-threatening, fix within 24 hours · Unit, Inside
- “The inspection date is on or between October 1 and March 31 and the permanently installed heating source is working and the interior temperature is 64 to 67.9 degrees Fahrenheit.*” Severe, fix within 30 days · Unit
- “The inspection date is on or between April 1 and September 30 and a permanently installed heating source is damaged, inoperable, missing, or not installed.*” Moderate, fix within 30 days · Unit, Inside
Lighting - Interior
- “At least one (1) permanently installed light fixture is not present in the kitchen and bathroom.*” Moderate, fix within 30 days · Unit, Inside
Minimum Electrical and Lighting
- “At least two (2) working outlets are not present within each habitable room. OR At least one (1) working outlet and one (1) permanently installed light fixture is not present within each habitable room.*” Moderate, fix within 30 days · Unit
Refrigerator
- “Refrigerator is missing.*” Moderate, fix within 30 days · Unit
Sink
- “Cannot activate or deactivate hot and cold water.*” Moderate, fix within 30 days · Unit, Inside
- “Sink is missing or not installed within the primary kitchen.*” Moderate, fix within 30 days · Unit
Smoke Alarm
- “Smoke alarm is not installed where required.*” Life-threatening, fix within 24 hours · Unit, Inside
Toilet
- “Toilet cannot be used in private.*” Moderate, fix within 30 days · Unit, Inside
*Affirmative Habitability Requirement per 24 CFR 5.703(d) and NSPIRE Final Rule
24 CFR 5.703 also requires a living room and, for voucher units, at least one bedroom or living/sleeping room for every two people; HUD’s checklist lists neither. Air conditioning is optional, but an air conditioner in the unit that does not turn on or does not cool is moderate.
How do you get ready for inspection day?
Confirm the date and which standard applies. Tell your tenant, and ask them to move personal items away from outlets and the panel; the regulation says “The family must allow the PHA to inspect the unit at reasonable times and after reasonable notice.”
- Utilities on. The inspector runs the hot water, heat, stove, outlets and lights. Relight any pilot light that is out.
- Appliances working, the ones you supply.
- Alarms tested shortly before, at a time you arrange with your tenant if the unit is occupied.
Your housing authority’s Administrative Plan sets who must be present, how much notice you get, and what happens if nobody lets the inspector in; HUD’s HQS-era landlord flowchart for biennial inspections shows that visit “Marked as a failed inspection.” Be there or send someone with keys, because HUD’s standards give the owner a part to play:
- Unlock the electrical panel, the water heater or furnace closet, and any locked area serving the unit; a panel nobody can unlock is cited as not accessible.
- Turn the stove and oven on and off for the inspector.
- Swap a dead bulb, plug in an unplugged bathroom fan, and press any CO alarm test button higher than 8 feet.
- For a smoke alarm without a test button, have a smoke alarm maintenance certificate ready; the inspector will ask for it.
What is the tenant responsible for?
The lease must say which utilities and appliances you supply and which the family supplies. The family may be held responsible for a tenant-paid utility it has not paid, a tenant-supplied appliance it has not provided or kept working, or damage beyond ordinary wear and tear by a household member or guest.
Under housing assistance payments (HAP) contracts signed on or after June 6, 2024, or renewed after that date (a contract renews when it runs past the lease’s first term), damage your tenant caused stays yours to fix unless your housing authority finds the tenant responsible and waives your duty to repair. If it does, it may not withhold or abate your payment for that item, and the family must take “all steps permissible under the lease and State and local law” to get it corrected. HUD’s May 7, 2024 voucher rule says that “might include paying the owner for the costs of the necessary repairs.”
What happens after a Section 8 inspection?
Your housing authority must notify you of every deficiency, and repair windows run from its written notice. HUD rates housing authorities on life-threatening fixes made “within 24 hours from the inspection”, so finish each within 24 hours of the inspection itself.
Miss a repair deadline and your housing authority must start enforcement on your HAP contract, such as withholding or abating payments, and you cannot charge that share to the family. What happens if you miss a repair window gives each step.
Your housing authority need not send an inspector back: under 24 CFR 982.405(i) it may accept “photographic evidence or other reliable evidence” of a repair. Notice PIH 2026-18 names photos and remote video, under each housing authority’s policy, and Notice PIH 2013-17 says photos should be “clearly labeled and matched to a specific item on the form.” Ask what yours accepts, and photograph each repair before and after, with the date.
Your housing authority may not charge you for the move-in inspection or the first inspection during a tenancy. A reasonable reinspection fee is allowed only when a reinspection finds a cited item you had to fix still unfixed, and you may not pass it to the family.
At move-in, a unit must pass before the tenancy is approved, unless your housing authority’s Administrative Plan uses one of two options. Under the first, a unit with severe or moderate items but no life-threatening one can be approved, and the family may turn it down. You then have 30 days from the HAP contract’s effective date to fix them. Miss that, and your housing authority withholds payments until it verifies the repairs; if the plan’s withholding period runs out first, it abates them, and if the repairs are never made, it ends the contract within 180 days of its effective date. You may not end the tenancy over withheld or abated payments.
Under the second, if you and the family agree, a unit that passed another program’s inspection in the last 24 months, such as a HOME, Low-Income Housing Tax Credit or HUD inspection, can be leased first. Your housing authority inspects within 30 days of the Request for Tenancy Approval and pays nothing until the unit passes, then pays back to the HAP contract’s effective date. If it fails, payment waits until every item is fixed, and goes back to that date if you fixed each on time.
Questions landlords ask
What do Section 8 inspectors look for under NSPIRE?
Every standard on HUD’s NSPIRE checklist for voucher units that applies to your unit and the common and outside areas serving it: 63 standards in the version dated May 8, 2026. Inspectors test alarms, outlets, GFCI protection, heat, water and appliances, check exits, stairs and guardrails, and look for leaks, pests, mold-like growth and deteriorated paint in housing built before 1978 where a child under 6 lives or will live, or in any pre-1978 Project-Based Voucher unit. NSPIRE drops subjective opinions on housekeeping and cosmetics, though anything that blocks an exit, or anything flammable or combustible on or within 3 feet of a heater or fuel-burning water heater, still fails.
How often is a Section 8 unit inspected?
At the start of each new tenancy, normally before the family moves in, then at least every two years, or every three years at small rural housing authorities. Your housing authority may choose to inspect every year. For Project-Based Voucher units, each periodic inspection covers a random sample of at least 20 percent of the contract units in each building. It also inspects when a tenant or government official reports a problem, and a supervisor may recheck your unit for quality control.
Does the landlord have to be at a Section 8 inspection?
Your housing authority’s Administrative Plan says who must be present. The family must let the inspector in at reasonable times after reasonable notice. Being there helps: HUD’s standards let you turn on the stove, swap a dead bulb and unlock the electrical panel during the visit, and a panel nobody can unlock is cited.
Can a tenant move in if the unit fails the Section 8 inspection?
Only if your housing authority uses one of two options HUD allows. Under the first, the move-in inspection finds severe or moderate items but no life-threatening one, and the family may still turn the unit down. You then have 30 days from the housing assistance payments (HAP) contract’s effective date to fix them. Miss that, and your housing authority withholds payments until it verifies the repairs; if they are still not made when the withholding period in its plan runs out, it abates payments, and if they are never made, it ends the contract no later than 180 days after its effective date. Under the second, if you and the family agree, a unit that passed another program’s inspection in the last 24 months, such as a HOME, Low-Income Housing Tax Credit or HUD inspection, can be leased before your housing authority inspects it. No payment is made until the unit passes that inspection, and your housing authority then pays back to the HAP contract’s effective date.
Will my housing authority accept photos instead of a reinspection?
It may. The regulation lets each housing authority accept photos or other reliable evidence from you in place of a return visit, at move-in or at a reinspection, and HUD names remote video as another method. Ask yours what it accepts, and label each photo with the item it shows.
How long does a Section 8 inspection take?
The burden statement on HUD’s NSPIRE checklist for voucher units estimates an average of 1 hour to complete each checklist, including the time for reviewing instructions. For a move-in inspection, a housing authority with up to 1,250 budgeted vouchers must inspect and give its decision within 15 days after you and the family submit the Request for Tenancy Approval, and that clock stops while the unit is not available for inspection.
Sources
The 48 documents this guide relies on
- HUD NSPIRE HCV/PBV Inspection Checklist, version dated May 8, 2026 (OMB 2577-0289)
- HUD Notice PIH 2026-18, Implementation of National Standards for the Physical Inspection of Real Estate Administrative Procedures for Voucher Programs (July 15, 2026), copy hosted by the Housing Authority of Gloucester County (NJ)
- 24 CFR 5.703, National standards for the condition of HUD housing (eCFR)
- 24 CFR 5.705, Inspection requirements (eCFR)
- 24 CFR 982.305, PHA approval of assisted tenancy (eCFR)
- 24 CFR 982.308, Lease and tenancy (eCFR)
- 24 CFR 982.310, Owner termination of tenancy (eCFR)
- 24 CFR 982.404, Maintenance: owner and family responsibility; PHA remedies (eCFR)
- 24 CFR 982.405, PHA unit inspection (eCFR)
- 24 CFR 982.406, Use of alternative inspections (eCFR)
- 24 CFR 982.551, Obligations of participant (eCFR)
- 24 CFR 983.103, Inspecting units (eCFR)
- 24 CFR 985.3, Indicators, HUD verification methods and ratings (SEMAP) (eCFR)
- 24 CFR part 35, subpart M, Tenant-Based Rental Assistance, Lead Safe Housing Rule (eCFR)
- 24 CFR 982.401, Housing quality standards, eCFR text as of May 10, 2023 (before NSPIRE)
- NSPIRE Inspection Standards notice, 88 FR 40832 (June 22, 2023), govinfo copy
- HOTMA final rule for the HCV and PBV programs, 89 FR 38224 (May 7, 2024), govinfo copy
- Streamlining Administrative Regulations final rule, 81 FR 12354 (March 8, 2016), govinfo copy
- Consolidated Appropriations Act, 2023 (Pub. L. 117-328), smoke alarms in federally assisted housing, govinfo copy
- Notice PIH 2013-17, HCV Program: Review of Existing HQS Requirements and the Use of Photos to Improve HQS Oversight (July 2, 2013)
- HUD, Housing Quality Standards (HQS) Biennial Inspection Flowchart, HCV Landlord Resources on HUD Exchange
- NSPIRE Standard: Smoke Alarm, V3.0 (08/11/23)
- NSPIRE Standard: Carbon Monoxide Alarm, V3.0 (08/11/23)
- NSPIRE Standard: Electrical - GFCI/AFCI (outlet or breaker), V3.0 (08/11/23)
- NSPIRE Standard: Electrical - Conductor, Outlet, and Switch, V3.0 (08/11/23)
- NSPIRE Standard: Electrical - Service Panel, V3.0 (08/11/23)
- NSPIRE Standard: Egress, V3.0 (08/11/23)
- NSPIRE Standard: Door - Entry, V3.0 (08/11/23)
- NSPIRE Standard: Window, V3.0 (08/11/23)
- NSPIRE Standard: Guardrail, V3.0 (08/11/23)
- NSPIRE Standard: Handrail, V3.0 (06/20/23)
- NSPIRE Standard: Steps and Stairs, V3.0 (06/20/23)
- NSPIRE Standard: Water Heater, V3.0 (06/20/23)
- NSPIRE Standard: Heating, Ventilation, and Air Conditioning (HVAC), V3.0 (08/11/23)
- NSPIRE Standard: Ventilation, V3.0 (08/11/23)
- NSPIRE Standard: Clothes Dryer Exhaust Ventilation, V3.0 (06/20/23)
- NSPIRE Standard: Fire Extinguisher, V3.0 (06/20/23)
- NSPIRE Standard: Cooking Appliance, V3.0 (08/11/23)
- NSPIRE Standard: Refrigerator, V3.0 (06/20/23)
- NSPIRE Standard: Toilet, V3.0 (08/11/23)
- NSPIRE Standard: Lighting - Interior, V3.0 (08/11/23)
- NSPIRE Standard: Mold-Like Substance, V3.0 (08/11/23)
- NSPIRE Standard: Infestation, V3.0 (08/11/23)
- NSPIRE Standard: Trip Hazard, V3.0 (08/11/23)
- NSPIRE Standard: Wall - Interior, V3.0 (08/11/23)
- NSPIRE Standard: Ceiling, V3.0 (08/11/23)
- NSPIRE Standard: Floor, V3.0 (08/11/23)
- NSPIRE Standard: Potential Lead-Based Paint Hazards, Visual Assessment, V3.0 (08/11/23)